Coromandel bridge to be closed for five weeks

NZTA/Twitter

State Highway 25 at the Kuaotunu River Bridge will close to all traffic this Sunday 22 September at 8am for five weeks.

The closure is to allow the bridge to be repaired after last week's heavy rain.

NZ Transport Agency Waikato System Manager Karen Boyt says following an assessment after last week's heavy rain, the bridge will need to be closed for around five weeks to repair weather damage.

'We understand the frustration this may cause for those who live in or travel to the area often, however, our contractors are working as hard as they can to repair the damage as quickly and efficiently as possible.”

Residents south of Blackjack Road will need to access Kuaotunu from Whitianga during this time.

Residents west of the bridge will only have vehicle access from the Coromandel side.

VMS boards will be clearly signposted via either SH25A and SH25 or SH25 Thames Coast Road.

Pedestrians will be able to cross the river via a separate, existing walk bridge.

'We hope to have the bridge open again by Labour Weekend, however, this is weather dependant.

'We will keep the community updated, and we ask motorists travelling to the area to check our Journey Planner, or call 0800 44 44 49 before leaving for the most up to date information about the repairs.”

A google maps image showing where the closure will be.

You may also like....

1 comment

army

Posted on 20-09-2019 08:02 | By dumbkof2

put the army in there. fixed in a few days. typical council job. three times as long as is necessary


Leave a Comment


You must be logged in to make a comment.